Projects Performed

Customer: Uspensky sugar factory, Russia

3 Products Scheme Launch
The supply includes:
Vacuum Pan ТВА-60 (without the massucuite chamber) – 4 sets of equipment.
Product Station Heating Scheme
Massecuite and Molasses Mixer – 1 set of equipment.
Automated System of the massecuite cooling crystallizer.

proj2004_1

Customer: Dobrinsky sugar factory, Russia

The 1st and 2nd Carbonation Filters ФиЛС-100 reconstruction with the use of sectional filter frames and the jointless filter hose, including Automated Control System in quality:
- for the 1st carbonation - 10 units;
- for the 2nd carbonation - 9 units.
Ejection sediment removal filter  UFE-0.8 mounting, 10 units. The filters are intended for heavy-bodied products filtration (up to 74%), fully automated
System of automated Control over the Juice Purification Station.

proj2004_2

Customer: Kamensky sugar factory, Russia

Lime Kiln Reconstruction with the following 2 lime kilns disconnecting

proj2004_3

Customer: Tbilissky sugar factory, Russia

Vacuum pans ТВА-60 - 4 sets for 1 Product

proj2004_4

Customer: Yelan’-Kolenovskiy sugar factory, Russia

Lime Kiln Reconstruction
Vacuum pans ТВА-75 (without the massecuite chamber) – 2 sets of equipment

proj2004_5

Customer: Griazinskiy sugar factory, Russia

Lime Kiln Automated control System
Lime Kiln Reconstruction

proj2006_2

Customer: Yeletsky sugar factory, Russia

System of automated Control over the Juice Purification Station

proj2004_7

Customer: Volodymyr-Volynsky sugar factory, Ukraine

Filters МВЖ modernization with the use of sectional filter frames and the jointless filter hose, and also Control System replacement in quantity as follows:
Juice Purification Station Automation
New Equipment supplied:
TS Carbonator for the 1st and 2nd Carbonation
Liming tank for the basic liming
Liming Tank before the 2nd carbonation
Product station Automated Control System (1 product)
Boiling scheme Launch of parent massecuite of the 1st product
Supply includes:
ТВА-75 -3 sets
ТВА-60 -1 set

proj2004_8

Customer: Gorohivsky sugar factory, Ukraine

Sugar Melting Station
Automated Control System for the Sugar Melting Station

proj2004_9

Customer: Vrbatsky sugar factory, Czechia

Lime Kiln Reconstruction, switching the Lime Kiln to Coal consumption
Automated Control System for the Liming Station

proj2004_10